September 10, 2018
Construction on the North Road (Route 231) bridge, spanning Brush Run in Blaine and Independence townships, Washington County will require a two-week detour beginning on September 18 to realign the existing roadway with the new bridge.
During this time, drivers will be directed to follow a detour on Brush Creek Road (Route 221), Green Cover Road (Route 4059) and Brush Run Road (Route 331).
In the event of unfavorable weather or unforeseen activities, this schedule may change.
This bridge is referred to as JV-522 and is one out of the 558 bridges being replaced under the Rapid Bridge Replacement Project. JV references the joint-venture partnership between Walsh/Granite, which is leading construction for the entire project.